by Truro Bathrooms Heating | Jul 6, 2021 | Bathrooms
A bathroom I have recently installed. This installation involved the complete removal of existing sanitary ware, tiles, flooring and associated materials. The walls were overboarded using foil back plaster board to protect from moisture and aid insulation. I also...
by Truro Bathrooms Heating | Jul 1, 2021 | Bathrooms
Another bathroom completed a few weeks ago. This one involved a complete rip out of the existing sanitary ware, tiles and boxing. Pipework was rerouted to minimise the boxing needed and new boxing fitted. Splash panel was fitted to every wall in the bathroom,...
by Truro Bathrooms Heating | Jun 1, 2021 | Bathrooms
Before and after pictures of a recent bathroom installation. This bathroom involved a full rip out of the existing sanitary ware, flooring and panelling on the walls. The floor was chased to move the location of the toilet and walls were chased to hide all pipework....
by Truro Bathrooms Heating | Mar 15, 2021 | Bathrooms
This job involved a complete rip out of the old bathroom suite taking the walls back to bare blockwork. The floor was chased to hide all of the existing exposed pipework, the floor was then self levelled and tiled. Nuance shower board fitted to the walls and colour...
by Truro Bathrooms Heating | Mar 15, 2021 | Bathrooms
This bathroom involved a full rip out of the old sanitary ware, pipework and tiles. The soil pipe vent was removed as it was running through boxing in the corner off the bathroom. I fitted an air admittance valve onto the existing soil pipe and boxed it in next to the...