by Truro Bathrooms Heating | Apr 7, 2024 | Bathrooms
The second bathroom installation carried out in the same property. Continuing with the large format tile theme with the addition of a hexagon terrazzo feature wall. This was another install whereby the existing bathroom was ripped out and reduced to bare walls. The...
by Truro Bathrooms Heating | Oct 23, 2022 | Heating
This job was the perfect candidate to have a Potterton electric candle stick boiler fitted. The old oil boiler was removed as the customer didn’t want to pay the high oil prices for the old inefficient oil boiler as it is only used a s back up. I fitted the new...
by Truro Bathrooms Heating | Jun 30, 2022 | Bathrooms
This Project involved a full rip out of the existing bathroom suite, stripping off two sets of tiles and removing all existing boarding to expose the stud work. Pipework was replaced and hidden in-between the stud work and a new stud work frame was installed around...
by Truro Bathrooms Heating | Feb 17, 2022 | Bathrooms
This bathroom involved stripping the walls back to bare block to remove the water damaged plasterboard. I first fixed all relevant pipework hiding the old surface mounted pipework in the walls to eliminate the need for boxing. Splash panel was then fitted to new...
by Truro Bathrooms Heating | Jan 10, 2022 | Bathrooms
This bathroom was a complete refurbishment, taking the internal walls back to bare block and stud work. Tile backer board was fitted around the bathroom to make sure the new tiles would properly adhere to the surfaces to ensure years of service from the bathroom. This...