This job involved a full new central heating install into a property which hasn’t previously had any heating.
The upstairs floors were cut up neatly along the floor joists to allow the new pipework to run through the floor voids to the new upstairs radiator positions. The downstairs radiators were spurred off the upstairs pipework and clipped down the walls in the least conspicuous places and piped along the top of the skirting to the new downstairs radiator positions. These pipes were then hidden with a white plastic covering to blend in with the walls.
The new gas combination boiler was fitted in the corner of the new kitchen to allow a kitchen cupboard to hide the boiler. The boiler flue was fitted horizontally out the side of the wall to the external air.