Another bathroom completed a few weeks ago.
This one involved a complete rip out of the existing sanitary ware, tiles and boxing. Pipework was rerouted to minimise the boxing needed and new boxing fitted.
Splash panel was fitted to every wall in the bathroom, including around the window reveal and boxing to create a seamless appearance. The ceiling was also boarded over using a white plastic panelling to protect from moisture and for minimal upkeep.
The floor was then tiled and new sanitary ware fitted, including an LED mirror and lighting around the sink unit.