Before and after pictures of a recent bathroom installation.
This bathroom involved a full rip out of the existing sanitary ware, flooring and panelling on the walls. The floor was chased to move the location of the toilet and walls were chased to hide all pipework. New sanitary ware and bathroom cupboards were installed and the room fully tiled. A p-shaped bath was installed to give more room when showering and saving space by not needing a separate bath and shower.