by Truro Bathrooms Heating | Aug 23, 2021 | Bathrooms
This bathroom involved a full rip out of the existing shower, sanitary ware, tiles and associated materials. I rerouted the existing waste pipework and radiator pipework to accommodate the new positions of the bathroom appliances as requested by my customer. The stud...
by Truro Bathrooms Heating | Jul 7, 2021 | Bathrooms
A recent bathroom installation. This bathroom involved the full removal of existing sanitary ware, tiles, plaster board and associated materials. Due to the existing dot and dab plaster board adhesive becoming weakened over time, this was removed to expose the bare...
by Truro Bathrooms Heating | Jul 5, 2021 | Bathrooms
This bathroom use to be two separate rooms: a disabled access wet room on one side of the wall and a separate toilet on the other side. I removed the partition wall to create a larger, more spacious bathroom. Tiles and flooring were removed; walls were taken back to...
by Truro Bathrooms Heating | Apr 21, 2021 | Bathrooms
Some before and after pictures of another bathroom completed. This bathroom I re-routed the existing pipework underneath the floor to remove the existing boxing around for a more seamless appearance. I fully tiled the walls from floor to ceiling, using a different...
by Truro Bathrooms Heating | Mar 21, 2021 | Bathrooms
Here are some photos of a finished bathroom completed a few weeks ago. After removing the existing sanitary wear and tiles, I rerouted the pipework that was previously on show so that it is now out of sight under the floor. I then prepped the wooden flooring using...