by Truro Bathrooms Heating | Apr 7, 2024 | Bathrooms
The second bathroom installation carried out in the same property. Continuing with the large format tile theme with the addition of a hexagon terrazzo feature wall. This was another install whereby the existing bathroom was ripped out and reduced to bare walls. The...
by Truro Bathrooms Heating | Jun 30, 2022 | Bathrooms
This Project involved a full rip out of the existing bathroom suite, stripping off two sets of tiles and removing all existing boarding to expose the stud work. Pipework was replaced and hidden in-between the stud work and a new stud work frame was installed around...
by Truro Bathrooms Heating | Feb 17, 2022 | Bathrooms
This bathroom involved stripping the walls back to bare block to remove the water damaged plasterboard. I first fixed all relevant pipework hiding the old surface mounted pipework in the walls to eliminate the need for boxing. Splash panel was then fitted to new...