Longdowns Bathroom Installation

Here are some photos of a finished bathroom completed a few weeks ago. After removing the existing sanitary wear and tiles, I rerouted the pipework that was previously on show so that it is now out of sight under the floor. I then prepped the wooden flooring using...

Woodview, Penryn Bathroom Installation

This job involved a complete rip out of the old bathroom suite taking the walls back to bare blockwork. The floor was chased to hide all of the existing exposed pipework, the floor was then self levelled and tiled. Nuance shower board fitted to the walls and colour...

Flushing bathroom installation.

Flushing bathroom installation completed. This bathroom involved a complete rip out of the old bath, sink, toilet and radiator. I also removed all of the old tiles on the walls and floors. All existing surface mounted pipework was removed and chased into the concrete...

Penryn Bathroom Installation

I installed a new bathroom suite in Penryn. Posted below is a collection of before and after bathroom suite images Initially, I removed all the old bathroom appliances including tiles, plasterboard and flooring from the old bathroom. I then replaced the chipboard...