Penryn Bathroom Installation

by | Bathrooms

This bathroom use to be two separate rooms: a disabled access wet room on one side of the wall and a separate toilet on the other side.

I removed the partition wall to create a larger, more spacious bathroom. Tiles and flooring were removed; walls were taken back to bare block and the floor self levelled. The ceiling was over boarded using a tongue and groove style splash panelling to protect from damp and mould in the future. Splash panelling was also fitted around the entire bathroom.

After chasing the floor to accommodate the new locations for sanitary ware and self levelling the floor the floor was then tiled and sanitary ware fitted and siliconed.

I fitted new LED spot lights and an LED mirror to combat the restricted natural lighting in the bathroom.

The addition of a new jacuzzi bath means my customers can relax whilst admiring their stylish new bathroom.