Here are some photos of a finished bathroom completed a few weeks ago.
After removing the existing sanitary wear and tiles, I rerouted the pipework that was previously on show so that it is now out of sight under the floor. I then prepped the wooden flooring using ditra matting to ensure the tiles wouldn’t crack with the movement in the floor.
I tiled the bathroom floor and walls.
I then fitted the free standing taps and bath, floating vanity unit with sit on top basin and the WC unit. A new anthracite panel radiator was then installed replacing the old night storage heater, to fit in with the new modern bathroom.