Flushing bathroom installation.

by | Bathrooms

Flushing bathroom installation completed.

This bathroom involved a complete rip out of the old bath, sink, toilet and radiator. I also removed all of the old tiles on the walls and floors. All existing surface mounted pipework was removed and chased into the concrete floor so it’s now hidden. I had to chase a new soil pipe into the floor to change the toilet position.

I studded the back wall off to enable the concealed shower unit to be fitted and to hide the pipework for the shower heads. I fitted electric underfloor heating and then completed all the tiling as seen in the photos. Once the tiling was completed I painted the bathroom and fitted the new toilet, sink, shower, towel rail and bathroom fixings.