by Truro Bathrooms Heating | Oct 23, 2022 | Heating
This job was the perfect candidate to have a Potterton electric candle stick boiler fitted. The old oil boiler was removed as the customer didn’t want to pay the high oil prices for the old inefficient oil boiler as it is only used a s back up. I fitted the new...
by Truro Bathrooms Heating | Jun 30, 2022 | Bathrooms
This Project involved a full rip out of the existing bathroom suite, stripping off two sets of tiles and removing all existing boarding to expose the stud work. Pipework was replaced and hidden in-between the stud work and a new stud work frame was installed around...
by Truro Bathrooms Heating | Feb 17, 2022 | Bathrooms
This bathroom involved stripping the walls back to bare block to remove the water damaged plasterboard. I first fixed all relevant pipework hiding the old surface mounted pipework in the walls to eliminate the need for boxing. Splash panel was then fitted to new...
by Truro Bathrooms Heating | Jan 14, 2022 | Heating
This job involved a full new central heating install into a property which hasn’t previously had any heating. The upstairs floors were cut up neatly along the floor joists to allow the new pipework to run through the floor voids to the new upstairs radiator...
by Truro Bathrooms Heating | Jan 14, 2022 | Heating
This boiler installation involved a complete update from a 30 year old heating system. All existing heating pipework, radiators, hot water cylinder and old floor standing boiler from the basement was removed. We installed a complete new heating system with hidden...